1,050 units, 87 blocks
The existing intercom systems in Çeşme 1st and 2nd Stage TOKİ residential complexes had deteriorated over time, resulting in communication issues and reduced system functionality. The project required the renewal of intercom systems across 1,050 residential units to address operational failures and restore reliable communication.
MRC Elektromekanik initiated field operations to renew the existing intercom infrastructure. The outdated and non-functional systems were replaced with new intercom solutions, aiming to restore reliable and uninterrupted communication for residents. The renewal works covered a total of 1,050 residential units.
EYLÜL / EKİM




